- Metallurgy & Mineral Processing
- Mine-to-mill optimisation: effect of feed size on mill throughput
- The building blocks for plant design
- Froth flotation circuit design and basic testwork requirements
- Testwork at Dominga IOCG project, Chile
- Metallurgical testwork from scoping to feasibility study level
- Determining gold balance in refractory gold ores
- Philex Silangan – the effects of copper mineralogy
- Grinding circuit design principles
- Processing copper-porphyritic ore
- Designing gold project flowsheets
- How process optimisation can improve the bottom line
- Geometallurgy: increasing orebody value
- Plant benchmarking: an opportunity for sustained efficiency
- In situ leaching or in situ recovery
- Leach circuit design principles
- Yellowknife gold project
- Cyanide destruction
- Exploration Geology
- Exploration for mineral deposits – global trends
- Indonesia – exploration on the cusp of development
- Structural geology collaboration results in new find for Sumitomo
- Providing expert advice to the Canahuire project in southern Peru
- Ground based geophysics
- Rapid assessment of structural geometries for brownfield targeting, Burkina Faso
- Target generation and grassroots exploration in Mauritania
- Evolution of SRK ES
- Applying conceptual geometrical models in evaluating mineral prospects
- Excalibur 3D targeting
- Maximising drilling to define the mineral resource at the Nkout Iron Ore project
- Deciphering structural controls in a greenstone belt in Ghana
- Project diversity and foreign interest spur SRK India’s growth and success
- Integrating structural geology for improved resource modelling
- Effective geological training and data management
- Exploring for specialty metals in Greenland
- Advanced exploration targeting: SRK’s approach
- Cheap and dirty, but essential: geological/structural mapping
- Overview of uranium exploration and the nuclear industry in Argentina
- New life for an old mine – Carmen, Chile
- Applying the box plot method
- The future of 3D modelling in consulting
- Mine Water Management
- Our perspective
- Drainage measures for ensuring the stability of the proposed cutback at Ok Tedi mine
- Designing field programs to maximise the capture of groundwater data
- Changing climate affects mine planning in South Africa
- Managing salt levels in mine water
- Water control evaluation for an iron ore project in Australia
- Collecting 3D data for dewatering of an underground uranium mine in Canada
- Hydrogeologic challenges for data collection in the field
- Impact of quarry deepening on local groundwater users
- Applying numerical groundwater modelling for mine dewatering projects around the world
- Early stage hydrogeological assessments in Central and West Africa
- Inflow water quality - Hope Bay, Nunavut
- Surface water management in the jungle of Brazil
- Mine water supply in the Middle East
- Water and chemical load balance for an underground mine in New Mexico
- Water management for closure, Nevada
- Source water protection planning
- Integrated geotechnical-hydrogeological field investigations in Sweden
- In-pit mine water control at the Grib mine in Russia
- Acid and metalliferous drainage
- Water-related environmental studies for a coal mine project in Chilean Patagonia
- Water supply: an increasing challenge in Chilean mining
- Mine water management with GoldSim in Indonesia
- Stormwater control on mines
- Managing sulfate impacts on water quality
- Integrated mine water management
- Facility Closure
- Mine and facility closure trends
- Closure of Mining Pond B at Richards Bay Minerals, South Africa
- What goes up…
- From abandoned site to community asset
- Closure north of 66°
- Land rehabilitation requirements and practices in Russia
- Using ecological risk assessment to establish closure criteria
- Rehabilitation and construction issues for Silvermines, Ireland
- A risk-based approach to tailings facility closure
- San Manuel, Arizona: from mining to reclamation
- Mine closure planning in the Chinese mining industry
- Demolition costing
- Mine closure regulation in Turkey
- Capital expenditure to reduce long term closure liability
- Reducing economic impacts from interim closure
- Soil covers for cold region mine closures
- How did the International Cyanide Code get started?
- Closure planning to comply with the International Cyanide Code
- Engineering solution to save Pacific salmon in the Tsolum River
- Using abandoned mines as field laboratories
- The Environmental Management Plan and closure planning
- Closure cost confusion
- Tailings, Heap Leach and Waste
- Anglo Platinum, Mogalakwena
- Challenges of tailings disposal in Russia and CIS countries
- Esperanza thickened tailings project
- Seepage control at the Colomac tailing containment area
- SRK leads investigation of very coarse granular materials
- Constructing water balance models using GoldSim™
- Solutions to reduce infiltration
- Penstock decant system for large tailings dams
- Numerical modelling of mineral sands
- Giroux Wash tailings impoundment
- Long term stockpiling of copper ore at Batu Hijau Mine
- Process pond modifications to mitigate groundwater elevation increase
- Tailings storage facility expansion
- Solid waste landfills
- Experience gained from tailings dam audits
- Synthetic liner pipe penetration
- New tailings impoundment feasibility design in Senegal
- Benefits of designing for closure in Nevada
- Rocks & Slope Stability
- International slope stability research
- Geotechnical characterisation
- Risk aware!!!
- 3D modelling structurally controlled weak rock masses using blockiness
- Estimating rock mass strength
- Itabirite iron ore bodies: Generic geotechnical models
- Safe and rapid development for major underground mines: Trends for the future
- Mining challenges in permafrost environments
- Shea Creek uranium project
- Integrating structural geology and geotechnics, Los Caracoles Dam
- Use of photogrammetric mapping techniques for slope stability
- Assessing geotechnical management using the Ground Blockiness Index (GBI)
- UDEC modelling
- Antamina geological modelling, Peru
- Koidu vertical pit, Sierra Leone
- Numerical analyses for evaluating pit wall and underground stability at Ok Tedi
- Blasting program optimises pit slope performance
- Economic success in underground soft rock mining
- Probabilistic stability analysis for pit slope optimisation at Jwaneng diamond mine, Botswana
- Geotechnical design considerations for mine shafts
- Geotechnical investigation for Kwatebala copper open pit, DRC
- Auditing the ground control management plan
- Rapid characterisation of slope instability using LiDAR
- Slope stability – fundamental concepts
- Weathered rock masses
- Slope design in challenging conditions at El Teniente, Chile
- Integrating structural geology and geotechnics at Venetia diamond mine
- Mining Project Evaluations
- Santa Rita project financing
- Due diligence study on a complex mining operation in Southern Africa
- Mining project evaluation in Brazil
- Environment and closure due diligence
- Palladon’s Iron Mountain project, Utah
- Technical review of a polymetallic project in East Africa
- A geological risk approach to valuing early-stage exploration projects
- Trekkopje
- Partnering with Polymetal: from IPOs to Compliance Audits for ongoing reporting
- Project evaluation course
- Due diligence in coal – do SRK clients get good value for their money?
- Re-evaluation of the base and precious metal potential south of the Kalimantan Arc
- Red Mountain gold project located in British Columbia, Canada
- El Chanate gold project, Mexico
- Independent review of world-wide exploration portfolio
- Marwa Wahau coal project–preliminary feasibility study
- Talvivaara
- SRK involvement
- Capstone Mining Corp’s Minto Mine
- Taking a holistic view in mining reviews and audits
- Growing up with a gold mine – SRK’s multi-level project support at Hycroft
- Site visit could be critical for identifying the potential fatal flaws
- Evaluating CIS projects
- Sino Gold
- Geology beyond the resource
- Kinsevere Copper Project: due diligence in the DRC
- Social Assessment, Engagement and Advice
- Big five - Tough social issues in mining
- Consultation towards a social license
- Strategies large-scale mining operations may employ in dealing with artisanal mining
- Value added through understanding the local social issues
- Tracking local skills in support of a commitment to employ locally
- Calculating resettlement costs
- The U.S. National Environmental Policy Act and Native Americans
- Stakeholder engagement: A key ingredient for project success
- Community input into Red Dog mine closure plan
- Recent SRK experiences with stakeholder engagement processes
- Stakeholders strengthen pipeline EIA
- SRK adds socio-economic value to project investments
- UK partners building skills in South African water sector
- Building early community relationships
- Enhanced social impact management
- Consultation for a major Bauxite project in Suriname, South America
- Environmental Process
- Integrating Environmental Assessment into Project Development Studies
- Challenges of Merging International and Local Requirements in Russia
- ESIAs for Marine Works
- Process for Implementing Environmental Management Systems in Chile
- SRK on the Leading Edge of Biodiversity
- Case Study from the Land Use Planning Sector, in Nelson Mandela Bay, South Africa
- Application of GIS in the EIA Process
- ESIA and Risk Assessment
- Assessing GHGs and Global Climate Change in EIAs
- Environmental and Safety Management Systems
- Influencing Sustainable Development Policy and Strategy in South Africa
- Suriname River Dredging Project
- Key International Initiatives Influencing Approaches to ESIA
- Promoting Compliance in Non-Compliant Markets – A Chinese Perspective
- Corporate Sustainability in a Carbon-Constrained Economy
- Focus on Uranium
- Trekkopje Definitive Feasibility Study
- Trekkopje Client Focus
- The Napperby Project in Australia
- Gamma Probe eU Data QA-QC Procedures
- Mineralogy Matters
- Grass Roots Uranium Exploration in Argentina
- Developing Uranium Processing Expertise
- Underground Uranium Scoping Study
- Uranium Exploration: the SRK Exploration Perspective
- In-Situ Recovery
- Institutional Controls on Radioactive Mine Wastes
- SOMAIR Uranium Mine Heap Leach Pad
- Pele Mountain Resources at the Elliot Lake Project
- Using JORC and CIM Guidelines for Uranium Resource Estimation
- Mineral Processing Overview
- Re-engineering the Elkon Deposit
- Characterizing the Long-term Stability and Porewater Quality of Uranium Mine Tailings
- Letlhakane Uranium Project, Botswana
- Kuriskova Uranium Project, Slovakia
- Focus on Coal
- Added Value to an Indonesian Client
- Exploration and GIS
- Griffin Coal – Geological Modeling and Resource Estimation
- Caledon’s Revolutionary Cook Colliery
- Coal Mine Dewatering
- Greenfields Coal Exploration in Southern Africa
- The Coal Team in South Africa
- Mining Prefeasibility Study for Morupule Power Station, Botswana
- Mine Planning Software in the Coal Sector
- Using Magnetic and Gravity Data in Basin and Coal-related Geology Studies
- Enterprise Risk Management at Work
- Bringing Coal Basins into Focus
- Relating Resource and Reserve Assessments to International Code Standards
- Managing Risks to Safety, Health, Environment and Sustainable Development Effectively
- Assisting an Emerging Coal Producer in Colombia
- The Russian Coal Industry
- Iron Ore
- Improving Performance through Benchmarking
- Interest in Chile’s Iron Deposits Renewed with Application of Modern Exploration Techniques
- Iron Rush
- Mining Scheduling with Geopit
- Due Diligence Review on Iron Ore Projects in China
- The Balla Balla Iron Ore Project
- SRK’s Involvement in Simandou
- Improved Water Consumption at the Sishen TSF Complex
- Iron Mineral Deposits and Projects in People’s Republic of China
- Iron Ore Prospecting in the Palaeoproterozoic Earaheedy Basin
- Cerro Nahuatl Iron Ore Mine in Colima, Mexico – A Conceptual Closure Plan
- Iron Ore exploration in South India
- Ferrexpo Poltava GOK
- Evaluating MHAG Brazil’s Mina do Bonito Operation for Noble
- Ferrexpo
- Technical Reports for Corumbá 43-101
- Focus on Geology
- SRK Structural Interpretation Assists Glencar’s Gold Discovery in Mali
- Mapping and Sampling Massive Sulfide Deposits on the Seafloor
- Probabilistic Targeting for Mesothermal Gold Mineralisation
- The Role of Remobilisation in the Formation of Nickel Sulfide Orebodies
- 3D Structural Mapping of Gold Continuity, Venezuela
- SRK’s Involvement in the DRC
- SRK Structural Modeling of the Kumtor Gold Deposit
- 3D Modeling of Structural Domains in Western Africa for Gold Fields
- Importance of Kimberlite Pipe Geometry and Kimberlite Emplacement Model
- JORC and the Chinese Resource Classification System – An SRK View
- Optimising Risk Assessment in Coal and Energy-rich Sedimentary Basins
- SRK Exploration Services – Optimistic Beginnings
- Dar es Salaam Office
- Significance of Structural Architecture in Controlling Mineralisation
- Valuation of Exploration Properties
- 3D Visualisation Techniques: New Advances and Applications
- Structural Controls on Kimberlite Geometry and Emplacement
- Building Geological Expertise for Clients in Chile
- Generating 4D Geological Maps from Regional Geophysics
- Independent Technical Reports: Adding Value
- SRK’s New Office in Kolkata
- Optimising Field Investigations
- 3D Structural Geology Modeling, Peru
- Waste Geochemistry
- Are your environmental data defensible?
- Improve reliability of post-closure water quality predictions
- New porphyry copper mine approval
- South America: Offices bring full power of SRK to their clients’ door
- Solving mining challenges in Africa & the Middle East
- In Memoriam: Ingrid Rozas Valenzuela
- The United Kingdom has thousands of abandoned metal mines
- Selective handling of wastes can reduce future treatment costs
- SRK expands its geochemical services in Australia
- SRK 30th Anniversary
Facility Closure

Issue #45: Focus on Facility Closure
Mine and facility closure trends
The field has changed a lot since SRK’s last newsletter with a closure theme, which we issued in July 2000. The above photograph illustrates one example of the current state of the practice. The graphs in this article show how some of those changes are really part of long-term trends. read full article…
Closure of Mining Pond B at Richards Bay Minerals, South Africa
In 2007 when Richards Bay Minerals (RBM) decided to close their Mining Pond B, SRK was appointed to manage the project. Prior to removing the pond and rehabilitating the pond area, the dredger had to be docked for transfer to another mining pond and the floating concentrator had to be demolished. The possibility of relocating the concentrator was also considered, but an SRK study showed that this was not cost effective. read full article…
What goes up…
The Australian mining industry is booming again! Despite the global financial downturn of 2009, mining investment continues to rise, with strong export growth in the iron ore, gold and coal sectors in 2010 and 2011. So, is it prudence or terminal pessimism that has motivated the Western Australian Department of Mines and Petroleum (DMP) to revise the Mining Act 1978 to impose more stringent mine closure obligations on mining operators and proponents? read full article…
From abandoned site to community asset
The Yankee Girl site is an abandoned tailings area located on the shore of a river in the small community of Ymir, British Columbia, Canada. Tailings periodically eroded into the river and oxidation resulted in the release of contaminants, including cadmium, lead and zinc, into a high-value fish habitat. After extensive consultation, the BC Crown Contaminated Sites Branch and the local office of SNC-Lavalin arrived at a remediation objective that would turn the area into a park-like setting for use by the local community. read full article…
Closure north of 66°
It’s another bitterly cold morning. Mine reclamation work has continued with the use of mobile light towers since the sun set for the season. A call comes in over the radio; the boom on an excavator has cracked. Minus 52°C has won the battle. The soil remediation activities will cease until spring. Closing a mine in the Arctic is no less a challenge than building one. read full article…
Land rehabilitation requirements and practices in Russia
Russian legislative requirements on closure and rehabilitation are contained in federal laws and related regulations, under titles law “About subsoil”, Land Code, law “About environmental protection”, “Instruction about the work order on liquidation and temporary closing-down of dangerous industrial projects related to the subsoil use”. A few state standards (GOSTs) also determine topsoil protection, conservation and use, and the rehabilitation of disturbed land. read full article…
Using ecological risk assessment to establish closure criteria
Does an open pit lake represent a toxic threat to wildlife after closure? If a former process pond is converted into an evapo-transpiration (ET) basin to manage heap leach and tailings drainage, does it create soil conditions that are hazardous to vegetation and soil organisms? These questions are increasingly being asked during the feasibility and permitting stages of mining projects, and the answers are guiding water management and closure strategies for mines around the world, to the benefit of the environment. read full article…
Rehabilitation and construction issues for Silvermines, Ireland
The Silvermines area in County Tipperary, Ireland comprises an area of around 5km2 plus a 74ha tailings facility. A number of abandoned open pits and underground mines were worked there, mainly from the 17th to 20th century, for lead, zinc, copper and barites with some silver. There is a legacy of health and safety issues, as well as potential mining heritage, with tourism and educational interest. read full article…
A risk-based approach to tailings facility closure
SRK recently undertook the closure design and implementation for the tailings facility at a defunct operation in central Nevada, USA. The facility stored gold cyanide tailings in three individual cells of differing heights and construction. Initially, SRK needed to access and review all the as-built records and the facility’s annual operational report as there was limited knowledge of cell design and condition. The operation had been defunct for a number of years and portions had been designed by three different engineering consulting companies. read full article…
San Manuel, Arizona: from mining to reclamation
The San Manuel property is a former integrated mining, milling and smelting operation located in central Arizona, USA. Large-scale mining activities started with underground block cave operations in the 1950s. In the mid-1980s, mining was expanded to include a surface heap-leach facility and an in-situ leach operation within the active cave area. Seven miles to the south, the mill, smelter and refinery processed ores from the San Manuel mine. read full article…
Mine closure planning in the Chinese mining industry
SRK stands at the forefront of mine closure planning in the Chinese Mining Industry. SRK China has completed numerous Independent Technical Reviews (ITRs), covering stock exchange listing, acquisition and/or financing for both domestic and internationally based mining projects. Through this due diligence process, the Chinese Mining Industry is adopting international standards and management practices, incorporating mine closure planning. read full article…
Mine closure regulation in Turkey
The “Regulation on Reclamation of Lands Disturbed by Mining Activities,” published in December 2007 and amended in January 2010, is a milestone toward establishing requirements for mine closure planning in Turkey. It requires that reclamation plans for mining projects be appended to the Environmental Impact Assessment (EIA) reports. The regulation provisions do pose general mitigating actions, such as post-mining safety of the land and acid rock drainage prevention and mitigation, but the process is still in its infancy and shows some limitations. read full article…
Demolition costing
An integral part of any facility closure is estimating the cost of removing the mine infrastructure that cannot be used for other purposes. This cost, while considerable, usually forms a smaller portion of the total closure liability. The approach taken in assessing demolition costs depends on the level of information available. New mines can usually provide drawings and schedules of quantities for the infrastructure, whereas older mines, at best, only retain surface layout plans. read full article…
Capital expenditure to reduce long term closure liability
SRK Reno recently designed and permitted a flotation tailings disposal impoundment in Nevada. The conceptual engineering design envisioned traditional grading, embankment construction, and a single synthetic liner overlain by a drainage system with a gravity outfall passing through the synthetic liner into a lined collection pond. In addition, the conceptual design required incorporating a diversion channel for upstream stormwater to accommodate 1-in-100-year, 24-hour peak flows for the regulated minimum design criteria. read full article…
Reducing economic impacts from interim closure
Interim or temporary closure can be defined as the cessation of the operation of a mine, or a mining or processing activity, as a result of a planned or unplanned activity. Cessation of operations can be precipitated by a number of factors such as a drop in commodity price, seasonal closures, unforeseen weather events, a failure in a major processing plant component, labor disputes, agency shutdowns, or litigation. Planned or unplanned temporary closure does not release an operator from their compliance obligations. read full article…
Soil covers for cold region mine closures
Soil covers are widely used in the closure of tailings and waste rock. However, current soil cover practices are based on experience from temperate regions, and on the theoretical basis provided by agricultural soil physics, which is also derived largely from studies in temperate zones. Two recent research projects led by SRK’s Vancouver office identified several dozen “cold region” processes with the potential to significantly affect soil covers in high latitude or high altitude locations. read full article…
How did the International Cyanide Code get started?
In response to public concern about environmental impacts from gold mining operations, the mining industry set up a stakeholder group under the United Nations Environmental Program to address prevention planning. The group developed a certification program to demonstrate responsible management of cyanide, protection of human health and prevention of environmental impacts. Companies comply with a set of nine principles related to cyanide handling and use, and must pass periodic audits. read full article…
Closure planning to comply with the International Cyanide Code
About 10 years ago, a multi-stakeholder group created a system that demonstrates a company’s voluntary commitment to environmental standards under the International Cyanide Code. Companies certified under the Code (referred to as Signatories) have publically committed to comply with its requirements and have demonstrated that their business is environmentally responsible. Principle 5 of the Code concerns decommissioning and addresses the issue of closure, which was often overlooked or underfunded by the mining industry in the past. read full article…
Engineering solution to save Pacific salmon in the Tsolum River
In partnership with local communities, the BC provincial government and local industry, SRK developed a long-term solution to control copper-bearing drainage that has been contaminating the headwaters of the Tsolum River for decades. The objective of the project was to improve water quality, return salmon, steelhead and cutthroat trout to local waters, and support the goal of sustainable BC fisheries. After briefly operating from 1964 to 1966, the Mount Washington copper mine has been a major source of acid rock drainage (ARD) entering the Tsolum River near Courtenay, BC. read full article…
Using abandoned mines as field laboratories
SRK Cardiff and Cardiff School of Engineering are collaborating to characterise the impacts associated with mine waste at historical sites in central Wales, stretching back over 800 years. Our study will systematically collect representative mine waste samples from historic mine dumps. Working with industrial archaeologists, the dumps will be dated. Samples will be subjected to a range of diagnostic leaching and characterisation tests and compared to fresh, unweathered wall rock from underground. read full article…
The Environmental Management Plan and closure planning
During 2009, SRK Johannesburg completed a number of environmental compliance audits as part of due-diligence exercises. These reviews showed that closure planning is frequently limited to strategies presented in an Environmental Management Plan (EMP). These EMPs are generally prepared during authorisation, years before mining and decades before closure. Once developed, these plans are seldom revisited for appropriateness. In SRK’s experience, closure requirements tend to focus on returning the site to some land capability that existed before mining. read full article…
Closure cost confusion
The last two decades have seen a significant evolution in both the methods and purposes for estimating closure costs. As part of this evolution, changes in how closure cost estimates are used have resulted in coincident changes in the scope, methods employed, and level of detail required. Before regulatory requirements were developed, closure cost estimates were typically intended for the planning, design, and contracting of the actual closure, and were often developed late in the mine life cycle. read full article…
|
You can download a PDF of the entire |
PDF A4
|
PDF Letter
|
|
|
|
Our newsletters focus on specific areas of interest to earth resource professionals and clients. Each is available as an Adobe Acrobat PDF file. If you don't already have Adobe's PDF reader, you can download it free.
