- Metallurgy & Mineral Processing
- Mine-to-mill optimisation: effect of feed size on mill throughput
- The building blocks for plant design
- Froth flotation circuit design and basic testwork requirements
- Testwork at Dominga IOCG project, Chile
- Metallurgical testwork from scoping to feasibility study level
- Determining gold balance in refractory gold ores
- Philex Silangan – the effects of copper mineralogy
- Grinding circuit design principles
- Processing copper-porphyritic ore
- Designing gold project flowsheets
- How process optimisation can improve the bottom line
- Geometallurgy: increasing orebody value
- Plant benchmarking: an opportunity for sustained efficiency
- In situ leaching or in situ recovery
- Leach circuit design principles
- Yellowknife gold project
- Cyanide destruction
- Exploration Geology
- Exploration for mineral deposits – global trends
- Indonesia – exploration on the cusp of development
- Structural geology collaboration results in new find for Sumitomo
- Providing expert advice to the Canahuire project in southern Peru
- Ground based geophysics
- Rapid assessment of structural geometries for brownfield targeting, Burkina Faso
- Target generation and grassroots exploration in Mauritania
- Evolution of SRK ES
- Applying conceptual geometrical models in evaluating mineral prospects
- Excalibur 3D targeting
- Maximising drilling to define the mineral resource at the Nkout Iron Ore project
- Deciphering structural controls in a greenstone belt in Ghana
- Project diversity and foreign interest spur SRK India’s growth and success
- Integrating structural geology for improved resource modelling
- Effective geological training and data management
- Exploring for specialty metals in Greenland
- Advanced exploration targeting: SRK’s approach
- Cheap and dirty, but essential: geological/structural mapping
- Overview of uranium exploration and the nuclear industry in Argentina
- New life for an old mine – Carmen, Chile
- Applying the box plot method
- The future of 3D modelling in consulting
- Mine Water Management
- Our perspective
- Drainage measures for ensuring the stability of the proposed cutback at Ok Tedi mine
- Designing field programs to maximise the capture of groundwater data
- Changing climate affects mine planning in South Africa
- Managing salt levels in mine water
- Water control evaluation for an iron ore project in Australia
- Collecting 3D data for dewatering of an underground uranium mine in Canada
- Hydrogeologic challenges for data collection in the field
- Impact of quarry deepening on local groundwater users
- Applying numerical groundwater modelling for mine dewatering projects around the world
- Early stage hydrogeological assessments in Central and West Africa
- Inflow water quality - Hope Bay, Nunavut
- Surface water management in the jungle of Brazil
- Mine water supply in the Middle East
- Water and chemical load balance for an underground mine in New Mexico
- Water management for closure, Nevada
- Source water protection planning
- Integrated geotechnical-hydrogeological field investigations in Sweden
- In-pit mine water control at the Grib mine in Russia
- Acid and metalliferous drainage
- Water-related environmental studies for a coal mine project in Chilean Patagonia
- Water supply: an increasing challenge in Chilean mining
- Mine water management with GoldSim in Indonesia
- Stormwater control on mines
- Managing sulfate impacts on water quality
- Integrated mine water management
- Facility Closure
- Mine and facility closure trends
- Closure of Mining Pond B at Richards Bay Minerals, South Africa
- What goes up…
- From abandoned site to community asset
- Closure north of 66°
- Land rehabilitation requirements and practices in Russia
- Using ecological risk assessment to establish closure criteria
- Rehabilitation and construction issues for Silvermines, Ireland
- A risk-based approach to tailings facility closure
- San Manuel, Arizona: from mining to reclamation
- Mine closure planning in the Chinese mining industry
- Demolition costing
- Mine closure regulation in Turkey
- Capital expenditure to reduce long term closure liability
- Reducing economic impacts from interim closure
- Soil covers for cold region mine closures
- How did the International Cyanide Code get started?
- Closure planning to comply with the International Cyanide Code
- Engineering solution to save Pacific salmon in the Tsolum River
- Using abandoned mines as field laboratories
- The Environmental Management Plan and closure planning
- Closure cost confusion
- Tailings, Heap Leach and Waste
- Anglo Platinum, Mogalakwena
- Challenges of tailings disposal in Russia and CIS countries
- Esperanza thickened tailings project
- Seepage control at the Colomac tailing containment area
- SRK leads investigation of very coarse granular materials
- Constructing water balance models using GoldSim™
- Solutions to reduce infiltration
- Penstock decant system for large tailings dams
- Numerical modelling of mineral sands
- Giroux Wash tailings impoundment
- Long term stockpiling of copper ore at Batu Hijau Mine
- Process pond modifications to mitigate groundwater elevation increase
- Tailings storage facility expansion
- Solid waste landfills
- Experience gained from tailings dam audits
- Synthetic liner pipe penetration
- New tailings impoundment feasibility design in Senegal
- Benefits of designing for closure in Nevada
- Rocks & Slope Stability
- International slope stability research
- Geotechnical characterisation
- Risk aware!!!
- 3D modelling structurally controlled weak rock masses using blockiness
- Estimating rock mass strength
- Itabirite iron ore bodies: Generic geotechnical models
- Safe and rapid development for major underground mines: Trends for the future
- Mining challenges in permafrost environments
- Shea Creek uranium project
- Integrating structural geology and geotechnics, Los Caracoles Dam
- Use of photogrammetric mapping techniques for slope stability
- Assessing geotechnical management using the Ground Blockiness Index (GBI)
- UDEC modelling
- Antamina geological modelling, Peru
- Koidu vertical pit, Sierra Leone
- Numerical analyses for evaluating pit wall and underground stability at Ok Tedi
- Blasting program optimises pit slope performance
- Economic success in underground soft rock mining
- Probabilistic stability analysis for pit slope optimisation at Jwaneng diamond mine, Botswana
- Geotechnical design considerations for mine shafts
- Geotechnical investigation for Kwatebala copper open pit, DRC
- Auditing the ground control management plan
- Rapid characterisation of slope instability using LiDAR
- Slope stability – fundamental concepts
- Weathered rock masses
- Slope design in challenging conditions at El Teniente, Chile
- Integrating structural geology and geotechnics at Venetia diamond mine
- Mining Project Evaluations
- Santa Rita project financing
- Due diligence study on a complex mining operation in Southern Africa
- Mining project evaluation in Brazil
- Environment and closure due diligence
- Palladon’s Iron Mountain project, Utah
- Technical review of a polymetallic project in East Africa
- A geological risk approach to valuing early-stage exploration projects
- Trekkopje
- Partnering with Polymetal: from IPOs to Compliance Audits for ongoing reporting
- Project evaluation course
- Due diligence in coal – do SRK clients get good value for their money?
- Re-evaluation of the base and precious metal potential south of the Kalimantan Arc
- Red Mountain gold project located in British Columbia, Canada
- El Chanate gold project, Mexico
- Independent review of world-wide exploration portfolio
- Marwa Wahau coal project–preliminary feasibility study
- Talvivaara
- SRK involvement
- Capstone Mining Corp’s Minto Mine
- Taking a holistic view in mining reviews and audits
- Growing up with a gold mine – SRK’s multi-level project support at Hycroft
- Site visit could be critical for identifying the potential fatal flaws
- Evaluating CIS projects
- Sino Gold
- Geology beyond the resource
- Kinsevere Copper Project: due diligence in the DRC
- Social Assessment, Engagement and Advice
- Big five - Tough social issues in mining
- Consultation towards a social license
- Strategies large-scale mining operations may employ in dealing with artisanal mining
- Value added through understanding the local social issues
- Tracking local skills in support of a commitment to employ locally
- Calculating resettlement costs
- The U.S. National Environmental Policy Act and Native Americans
- Stakeholder engagement: A key ingredient for project success
- Community input into Red Dog mine closure plan
- Recent SRK experiences with stakeholder engagement processes
- Stakeholders strengthen pipeline EIA
- SRK adds socio-economic value to project investments
- UK partners building skills in South African water sector
- Building early community relationships
- Enhanced social impact management
- Consultation for a major Bauxite project in Suriname, South America
- Environmental Process
- Integrating Environmental Assessment into Project Development Studies
- Challenges of Merging International and Local Requirements in Russia
- ESIAs for Marine Works
- Process for Implementing Environmental Management Systems in Chile
- SRK on the Leading Edge of Biodiversity
- Case Study from the Land Use Planning Sector, in Nelson Mandela Bay, South Africa
- Application of GIS in the EIA Process
- ESIA and Risk Assessment
- Assessing GHGs and Global Climate Change in EIAs
- Environmental and Safety Management Systems
- Influencing Sustainable Development Policy and Strategy in South Africa
- Suriname River Dredging Project
- Key International Initiatives Influencing Approaches to ESIA
- Promoting Compliance in Non-Compliant Markets – A Chinese Perspective
- Corporate Sustainability in a Carbon-Constrained Economy
- Focus on Uranium
- Trekkopje Definitive Feasibility Study
- Trekkopje Client Focus
- The Napperby Project in Australia
- Gamma Probe eU Data QA-QC Procedures
- Mineralogy Matters
- Grass Roots Uranium Exploration in Argentina
- Developing Uranium Processing Expertise
- Underground Uranium Scoping Study
- Uranium Exploration: the SRK Exploration Perspective
- In-Situ Recovery
- Institutional Controls on Radioactive Mine Wastes
- SOMAIR Uranium Mine Heap Leach Pad
- Pele Mountain Resources at the Elliot Lake Project
- Using JORC and CIM Guidelines for Uranium Resource Estimation
- Mineral Processing Overview
- Re-engineering the Elkon Deposit
- Characterizing the Long-term Stability and Porewater Quality of Uranium Mine Tailings
- Letlhakane Uranium Project, Botswana
- Kuriskova Uranium Project, Slovakia
- Focus on Coal
- Added Value to an Indonesian Client
- Exploration and GIS
- Griffin Coal – Geological Modeling and Resource Estimation
- Caledon’s Revolutionary Cook Colliery
- Coal Mine Dewatering
- Greenfields Coal Exploration in Southern Africa
- The Coal Team in South Africa
- Mining Prefeasibility Study for Morupule Power Station, Botswana
- Mine Planning Software in the Coal Sector
- Using Magnetic and Gravity Data in Basin and Coal-related Geology Studies
- Enterprise Risk Management at Work
- Bringing Coal Basins into Focus
- Relating Resource and Reserve Assessments to International Code Standards
- Managing Risks to Safety, Health, Environment and Sustainable Development Effectively
- Assisting an Emerging Coal Producer in Colombia
- The Russian Coal Industry
- Iron Ore
- Improving Performance through Benchmarking
- Interest in Chile’s Iron Deposits Renewed with Application of Modern Exploration Techniques
- Iron Rush
- Mining Scheduling with Geopit
- Due Diligence Review on Iron Ore Projects in China
- The Balla Balla Iron Ore Project
- SRK’s Involvement in Simandou
- Improved Water Consumption at the Sishen TSF Complex
- Iron Mineral Deposits and Projects in People’s Republic of China
- Iron Ore Prospecting in the Palaeoproterozoic Earaheedy Basin
- Cerro Nahuatl Iron Ore Mine in Colima, Mexico – A Conceptual Closure Plan
- Iron Ore exploration in South India
- Ferrexpo Poltava GOK
- Evaluating MHAG Brazil’s Mina do Bonito Operation for Noble
- Ferrexpo
- Technical Reports for Corumbá 43-101
- Focus on Geology
- SRK Structural Interpretation Assists Glencar’s Gold Discovery in Mali
- Mapping and Sampling Massive Sulfide Deposits on the Seafloor
- Probabilistic Targeting for Mesothermal Gold Mineralisation
- The Role of Remobilisation in the Formation of Nickel Sulfide Orebodies
- 3D Structural Mapping of Gold Continuity, Venezuela
- SRK’s Involvement in the DRC
- SRK Structural Modeling of the Kumtor Gold Deposit
- 3D Modeling of Structural Domains in Western Africa for Gold Fields
- Importance of Kimberlite Pipe Geometry and Kimberlite Emplacement Model
- JORC and the Chinese Resource Classification System – An SRK View
- Optimising Risk Assessment in Coal and Energy-rich Sedimentary Basins
- SRK Exploration Services – Optimistic Beginnings
- Dar es Salaam Office
- Significance of Structural Architecture in Controlling Mineralisation
- Valuation of Exploration Properties
- 3D Visualisation Techniques: New Advances and Applications
- Structural Controls on Kimberlite Geometry and Emplacement
- Building Geological Expertise for Clients in Chile
- Generating 4D Geological Maps from Regional Geophysics
- Independent Technical Reports: Adding Value
- SRK’s New Office in Kolkata
- Optimising Field Investigations
- 3D Structural Geology Modeling, Peru
- Waste Geochemistry
- Are your environmental data defensible?
- Improve reliability of post-closure water quality predictions
- New porphyry copper mine approval
- South America: Offices bring full power of SRK to their clients’ door
- Solving mining challenges in Africa & the Middle East
- In Memoriam: Ingrid Rozas Valenzuela
- The United Kingdom has thousands of abandoned metal mines
- Selective handling of wastes can reduce future treatment costs
- SRK expands its geochemical services in Australia
- SRK 30th Anniversary
Assessing GHGs and Global Climate Change in EIAs

The issue of global climate change remains a highly contentious subject for both layman and world leaders alike. However, regardless of your social, political or scientific position on the root causes, many governments have identified global warming a major threat to the planet in the 21st Century.
As a result, considerable interest has been raised in energy consumption/conservation, emissions and inventory, “green” design, sustainability, environmental management, rehabilitation, and corporate responsibility. Government agencies, financial institutions, and even private corporations are adopting new policies and guidance as part of their project development and approval procedures. In this new arena, the work of assessing and managing “greenhouse gas” (GHG) emissions and potential climate change has become a component of environmental impact assessments, particularly for larger-scale projects such as mine development.
Even the United States, which has yet to ratify its signing of the Kyoto Protocol, has implemented guidance on incorporating the consideration of climate change in planning and National Environmental Policy Act documents. Agencies within the U.S. Department of the Interior, including the Bureau of Land Management, Forest Service, and Fish & Wildlife Service, must now consider GHG emissions in the potential scale of projects, acknowledging the possible contributions of manmade pollutants to global climate change.
New regulations and standards for assessing GHG emissions need to be considered during project development. However, quantifying and projecting the impacts of GHG emissions is not a simple task, and definitive answers remain elusive. A number of carbon dioxide (CO2) and GHG emissions calculators are currently available online. One of the more common methods uses typical combustion product emission factors, which are based on test data for standardised equipment and operations. Another approach follows the Greenhouse Gas Protocol (GHG Protocol), an international accounting tool issued by the World Resources Institute (WRI) and the World Business Council for Sustainable Development (WBCSD) that provides step-by-step guidance for governments and businesses to quantify and thereby manage GHG emissions.
In one recent example of implementing these new policies and procedures, SRK (UK) calculated GHG emissions as part of an assessment of a new mining project in Greenland for one of its Canadian clients. For the project, SRK was required to quantify the emission of CO2 from equipment and facilities, and assess the calculated levels against thresholds established by the International Finance Corporation (IFC) under Performance Standard 3 for Pollution Prevention and Abatement to determine the likely increase to Greenland’s current emission levels. In the final assessment, this particular issue rated as the most significant impact because it appeared that the project could potentially increase Greenland’s GHG emissions by 35 percent over current estimates.
This conclusion, which is characterised by all of the uncertainty and variability in assessing global climate change, including factors such as population change, economic change, technological development and other aspects of future human activity, emphasises the need for a better understanding of the real impact of projects in global terms. SRK is poised to meet the challenges of assessing GHG emissions for our world-wide mining clients.
Mark Willow: mwillow@srk.com
As a result, considerable interest has been raised in energy consumption/conservation, emissions and inventory, “green” design, sustainability, environmental management, rehabilitation, and corporate responsibility. Government agencies, financial institutions, and even private corporations are adopting new policies and guidance as part of their project development and approval procedures. In this new arena, the work of assessing and managing “greenhouse gas” (GHG) emissions and potential climate change has become a component of environmental impact assessments, particularly for larger-scale projects such as mine development.
Even the United States, which has yet to ratify its signing of the Kyoto Protocol, has implemented guidance on incorporating the consideration of climate change in planning and National Environmental Policy Act documents. Agencies within the U.S. Department of the Interior, including the Bureau of Land Management, Forest Service, and Fish & Wildlife Service, must now consider GHG emissions in the potential scale of projects, acknowledging the possible contributions of manmade pollutants to global climate change.
New regulations and standards for assessing GHG emissions need to be considered during project development. However, quantifying and projecting the impacts of GHG emissions is not a simple task, and definitive answers remain elusive. A number of carbon dioxide (CO2) and GHG emissions calculators are currently available online. One of the more common methods uses typical combustion product emission factors, which are based on test data for standardised equipment and operations. Another approach follows the Greenhouse Gas Protocol (GHG Protocol), an international accounting tool issued by the World Resources Institute (WRI) and the World Business Council for Sustainable Development (WBCSD) that provides step-by-step guidance for governments and businesses to quantify and thereby manage GHG emissions.
In one recent example of implementing these new policies and procedures, SRK (UK) calculated GHG emissions as part of an assessment of a new mining project in Greenland for one of its Canadian clients. For the project, SRK was required to quantify the emission of CO2 from equipment and facilities, and assess the calculated levels against thresholds established by the International Finance Corporation (IFC) under Performance Standard 3 for Pollution Prevention and Abatement to determine the likely increase to Greenland’s current emission levels. In the final assessment, this particular issue rated as the most significant impact because it appeared that the project could potentially increase Greenland’s GHG emissions by 35 percent over current estimates.
This conclusion, which is characterised by all of the uncertainty and variability in assessing global climate change, including factors such as population change, economic change, technological development and other aspects of future human activity, emphasises the need for a better understanding of the real impact of projects in global terms. SRK is poised to meet the challenges of assessing GHG emissions for our world-wide mining clients.
Mark Willow: mwillow@srk.com
|
You can download a PDF of the entire |
PDF A4
|
PDF Letter
|
|
|
|
Our newsletters focus on specific areas of interest to earth resource professionals and clients. Each is available as an Adobe Acrobat PDF file. If you don't already have Adobe's PDF reader, you can download it free.
