Feasibility Studies
Approach
Experience
SRK staff are able to cover the complete range of disciplines required to produce a feasibility study for a mining project. The SRK approach would typically be to assist with the field work, testing and laboratory programs required to gather the base data. Prior to undertaking the feasibility study, scoping and pre-feasibility studies will have defined the project scope and direction.
The feasibility study itself would be tackled by a group of in-house consultants from the UK office managed by an experienced professional engineer. Where necessary, specialist sub consultants would be brought in to provide input on key parts of the study. Quality is maintained through regular in-house reviews by the project director. Client liaison is of paramount importance and regular progress reports and meetings are considered to be integral parts of the study.
In Russia and CIS it is sometimes necessary to produce seperate feasibility studies to satisfy both local and international requirements. In this case, SRK typically works alongside local Design Institutes to share information with joint fieldwork, laboratory and technical design programs. The result is a feasibility study from SRK suitable for international financing and a local 'Projekt' style of feasiblity study for local permitting. This approach provides access to capital markets outside of Russia and CIS and reduces the duplication of technical work.
In Russia and CIS it is sometimes necessary to produce seperate feasibility studies to satisfy both local and international requirements. In this case, SRK typically works alongside local Design Institutes to share information with joint fieldwork, laboratory and technical design programs. The result is a feasibility study from SRK suitable for international financing and a local 'Projekt' style of feasiblity study for local permitting. This approach provides access to capital markets outside of Russia and CIS and reduces the duplication of technical work.
Services
The services that SRK can provide are as follows:
- Coverage of the full range of field activities required to prepare a Feasibility Study including supervision of drilling, geological and geotechnical core logging, site investigation work, hydrogeological testing and environmental sampling programs. SRK has a pool of experienced staff available to work in the field gathering data for technical studies.
- Design and supervision of laboratory test work programs for determining process plant recovery and design parameters.
- Project management of the study process by highly experienced staff.
- Technical design work on all the disciplines required for a feasibility study in accordance with internationally accepted norms for bankable level studies.
- Detailed financial modelling and analysis.
- Preparation of an Environmental and Social Impact Assessment (ESIA) in accordance with IFC Performance Standards and World Bank Guidelines and
- Risk assessment and implementation planning.
Experience
SRK has a proven track record of completing feasibility studies on time and within budget. Recent projects include:
Sindesar Khurd Mine, India. SRK carried out feasibility studies to expand this underground lead/ zinc mine from 300ktpa to 2Mtpa
Sindesar Khurd Mine, India. SRK carried out feasibility studies to expand this underground lead/ zinc mine from 300ktpa to 2Mtpa
Voskhod Chrome Project, Kazakhstan. SRK completed a bankable level Feasibility Study on this project for an underground chromite mine with associated process plant and infrastructure. The Voskhod Mine was the first mine in Kazakhstan to be accessed solely through a decline with no shaft access planned. One of the challenges of this project was to provide heating for the mine in the winter.
Malanjkhand Copper Mine, India. SRK completed a feasibility study for the expansion of this open pit mine which included a detailed operational review of the current mining activities.
Khetri Copper Complex, India. SRK carried out feasibility studies for the expansion of the existing Khetri and Kolihan mines belonging to Hindustan Copper. In addition, SRK designed the layout of the proposed Banwas Mine.
Aguas Teñidas, Spain. SRK undertook a bankable level Feasibility Study on this project for an underground based metal mine with associated process plant and infrastructure. The project utilised paste backfill to maximise orebody recovery and reduce the tailings footprint on surface.


